Project Description

Everything from City Council chambers to a police crime lab is included in this new municipal center. Our design cost-effectively accommodates the Mayor, the Police Chief, heated Council meetings and daily city functions in a 3-story building with a large 2-story entry. Mechanical systems include Variable Air Volume with hot water reheat to allow all spaces individual temperature control. The public safety division includes laboratory space with fume hoods and specialized evidence storage spaces for narcotics along with a vehicle bay, all of which required special ventilation to control odors and contaminants. Close coordination with the public safety division was required to understand the areas usage and hours of operation.

Services
Administration
City Hall
Office
Police
Public Safety

Client
GSBS Architects

Contractor
Layton Construction

Value
$28 million

Area
85,000 sf

Location
Murray, UT

Completed
Under construction

SIMILAR PROJECTS